A new cradle crossing has been commissioned in the branch of RSE "Kazhydromet" in the North Kazakhstan region. Construction of this facility at the hydrological post of the Sharyk-S. river.Ruzaevka was organized in 2022. The hydrological post, where a new crossing is installed, is necessary to calculate the development of flood processes on the Sharyk River, Akkanburluk River and Yesil River. The cradle crossing allows qualitative measurements of water flow on the Sharyk River and its tributary of the Zhembarak river. Accurate information from hydrological posts is the prevention of river flooding and complete information for predicting flood processes.